Blog
Blog
Filters

July 2026
From Post-Processing to Real Time: Our New Step for Breakwater Placement Control
Since 2019, SEABIM has been digitising breakwater armour units in 3D through post-processing. Discover how real-time digitisation is now transforming placement control on maritime construction sites.

June 2026
Scanning a breakwater: essential knowledge before embarking on the process
Conducting a high-quality survey of a breakwater is a complex yet crucial task. Reliable data is indispensable for creating a 3D model and validating the structure. Discover the key challenges, survey methods, and how SEABIM can support you.

May 2026
How did CLI change their process for validating breakwater armor units using a 3D digital twin?
For years, validating the compliance of breakwater armor layers demanded the full-time presence of an on-site diver inspector. CLI (Concrete Layer Innovations) revolutionized this process by adopting a 3D digital twin approach — cutting costs and redefining inspection standards.

April 2026
How can 3D digital twins improve monitoring of breakwaters?
Breakwaters protect ports and coastal areas from swells and flooding, but monitoring them remains a major technical challenge. With climate change and more frequent extreme weather events, monitoring breakwaters has become critical. New solutions are emerging, notably 3D digital twins.

